Working in conjunction with the Vent, Architectural Products, Smoke Control Systems specified actuators to operate AOV Vents above the common areas at the Academy. This project was all the more difficult as it was a retro fit process while the building was occupied meaning extra safe systems of work had to be implemented to ensure minimal disruption to both students and staff.